City of Calgary contract: 99.57% on time in 2025.

CLI took over a city-wide locate contract from the incumbent provider in March 2023. By 2025 the average on-time completion was 99.57% across 70,528 tickets.

99.57%average on-time completion in 2025
70,528locate tickets completed in 2025
About 50field staff hired for the takeover
3 yearsrenewal from May 1, 2026, plus two 1-year options

Case study · Alberta

A city-wide contract, taken over from the incumbent.

In March 2023, CLI took over a major locate contract from the incumbent locate service provider. The contract area is the whole City of Calgary.

CLI's multi-year Calgary contract names ATCO Gas and Pipelines Ltd., The City of Calgary, ENMAX Power Corporation, and TELUS Communications Company.

The start-up window was narrow. CLI hired approximately 50 field staff, including 4 supervisors, and 5 administrative staff for billing and dispatch. Everyone was trained on CLI's software and policies, and the vehicles and equipment were in place for the start.

The record

Three years, counted in Locatorbase.

Average on-time completion rose each year as ticket volume stayed above 70,000.

96.95%on time, March to December 2023, across 78,150 tickets
99.45%on time in 2024, across 76,099 tickets
99.57%on time in 2025, across 70,528 tickets
Utility locating instruments organized for technician training

How it is controlled

The program behind the numbers.

The Calgary crews work under the same controls as every CLI contract. The contract was renewed on May 1, 2026 for 3 years, with two 1-year options.

  • Facility-owner-administered exams with an 80% competency threshold
  • Six weeks of supervised field release
  • Ongoing supervisory audits on locate performance, safety, and drawing accuracy
  • Monthly safety statistics to each facility owner

More from Alberta.

Locators from Calgary supported the contract south of the city when an unannounced fibre project started in Brooks.

CLI technician marking utilities on a suburban sidewalk

Municipal and utility buyers

Ask for the references behind this record.

CLI can walk your team through the contract scope, the controls, and the reporting.