Utility locate marks and colour-coded flags along a residential sidewalk

Who to contact before you dig in Ontario, Alberta, and BC.

Each province has its own notification service. Here is where the request starts and how much notice to plan for.

Field guide

Start with the provincial service.

A locate request starts with the notification service for your province, not with a call to each utility. The service takes the request, gives you a ticket, and notifies the owners of buried infrastructure near your dig.

Build the notice period into the work plan. A late request is how a crew ends up choosing between a delay and a strike, and a strike brings fines, failed inspections, and downtime.

By province

Where to start, and how much notice.

Ontario: Ontario Dig Authority (formerly Ontario One Call)

Contact it at least 5 business days before a single-address project, or 10 business days before a multi-address or large project. Its rules set a 5-business-day deadline for standard locates and 10 for large ones, unless a new date is agreed in writing.

Alberta: Utility Safety Partners

Submit the request at least 3 to 5 full working days before the planned ground disturbance. After that, owners mark their lines, contact you to arrange a time, or give written clearance to proceed.

British Columbia: BC 1 Call

Submit the ticket online or by phone. BC 1 Call says members respond within 3 business days of notification, or 5 business days for large projects.

Before you call

What to have ready, and what to check.

Have the site address, planned dig dates, and locate ticket number ready when you contact CLI. Add your role and a working phone number so the routing can be confirmed without a second call.

Read the locate documentation before work starts. Utility Safety Partners notes that the documentation shows when the locate expires.

These services change their rules, and some owners are not registered with them. Utility Safety Partners says most, but not all, utility owners are registered. Check the current requirements with the service before you rely on any timeline here.

Sources: Ontario Dig Authority: public utility locates, Ontario Dig Authority: Rules (PDF), Utility Safety Partners: notification process, Utility Safety Partners: FAQ, BC 1 Call.

Quick answers

Before you dig: common questions.

01Is a locate required before digging in Alberta?

Yes. Utility Safety Partners states that it is mandatory for all buried utilities to be marked before a ground disturbance begins, citing the Alberta Occupational Health and Safety Code and other regulations.

02How early can I submit an Ontario request?

Ontario's rules say a standard request should be made no more than 30 calendar days before the proposed excavation.

03Can I get a faster locate in Ontario?

A priority request applies only in limited cases, such as when significant hardship would result and the request could not reasonably have been made earlier. The rules do not guarantee completion by your dig date.

04Does the provincial service mark every line?

No. Privately owned lines are generally outside the public process, so a private locate may be needed.

CLI technician marking utilities on a suburban sidewalk

Put it to work

Discuss your next project.

Have the site address, dig dates, and locate ticket number ready, or talk to the team about a contract scope.