Scam warningFake websites and recruiters are using CLI's name to offer jobs and visas. CLI never asks job applicants for money.Fake CLI job offers are circulating.How to spot the real CLI

GNSS survey tripod collecting location data beside a lake

SUE quality levels A to D: what each one tells a designer.

Subsurface utility engineering rates how far you can trust a utility location on a drawing. Here is what each level means.

Field guide

The level describes the evidence behind the line.

A line on a drawing can come from an old record or from a crew that exposed the pipe. Subsurface utility engineering, or SUE, separates the two with four quality levels, from D at the lowest to A at the highest.

The levels come from ASCE 38-22, a US standard. In Canada, CSA S250 specifies mapping requirements for underground utility infrastructure. Confirm with your engineer which standard the project specification calls for.

The four levels

From records to exposure.

Quality Level D: existing records

Information from utility records or verbal recollection. Useful for early planning and route selection, but often incomplete or inaccurate.

Quality Level C: surveyed surface features

Visible features such as manholes and valve boxes are surveyed and matched to the records. Lines without a surface feature can still be missed or misplotted.

Quality Level B: geophysical designating

Surface methods such as ground-penetrating radar and electromagnetic locating find the horizontal position of a line, which is then marked and surveyed.

Quality Level A: physical exposure

The utility is exposed by non-destructive excavation, such as a test pit, to record its precise horizontal and vertical position, plus type, size, and material. It is the highest level and is often saved for specific conflict points.

Choosing a level

Match the level to the risk.

Not every line needs the same level. Records may be enough to compare routes. Once design locks, utility conflicts cost more to fix, so a project may need QL-B across the corridor and QL-A where a new line crosses a critical one.

CLI's mapping deliverables are SUE Quality Level B. Delivered with our sister company Tierra Geomatic, SUE site investigations run from Quality Level D through Level A, including test pitting for Standard A with full reporting.

Sources: FHWA: Subsurface Utility Engineering, ASCE: ASCE 38-22 standard, CSA Group: CSA S250:20.

Quick answers

SUE: common questions.

01Is a SUE investigation the same as a locate?

No. A locate marks lines on the ground so a crew can dig. SUE documents utility information for design, with a stated quality level for each line.

02What does QL-A mean by locating?

In SUE, QL-A is sometimes called locating because it means physically exposing the line. That is different from a field locate, which marks the line from the surface.

03What is the difference between QL-B and QL-A?

QL-B gives the horizontal position from surface methods. QL-A exposes the line to record its vertical position and physical details as well.

CLI technician marking utilities on a suburban sidewalk

Put it to work

Discuss your next project.

Have the site address, dig dates, and locate ticket number ready, or talk to the team about a contract scope.