Mapped addresses across the St. Catharines program area

St. Catharines pre-engineering: 20,000 addresses in 3 months.

CLI mapped the entire city of St. Catharines, 20,000 addresses, in 3 months. The owner keeps a permanent record of what is underground.

20,000addresses mapped
3 monthsto map the entire city
QL-BSUE quality level of CLI mapping deliverables
Permanentlegally defensible site record

Case study · Ontario

A whole city mapped before the build.

Pre-engineering locates find the underground utilities before the design locks, so a conflict shows up on a drawing and not on site. In St. Catharines, CLI mapped the entire city: 20,000 addresses in 3 months.

CLI's mapping deliverables are SUE Quality Level B. Each program leaves the owner a permanent, legally defensible site record.

CLI's mapping crews carry GlobeSurv, a rugged handheld device with RTK-level accuracy. The data goes from the field into GIS, and the device works online and offline.

The pre-engineering work continues with active operations in Oakville and an expansion into Mississauga.

Mapped utility network record from the St. Catharines pre-engineering program
A mapped network record from the St. Catharines program.

What the owner gets

Three results from mapping early.

Design

Conflicts found on paper

Identify utility conflicts before you break ground.

Schedule

Fewer stoppages

Prevent costly on-site delays and work stoppages.

Record

A permanent record

A permanent, legally defensible site record of the mapped utilities.

The services behind the program.

Pre-engineering locates, pre-engineering mapping, topographic surveys, landbase mapping, drilling route guidance, and CAD services for all of them.

CLI technician marking utilities on a suburban sidewalk

Before the design locks

Bring the project area and the data requirement.

Tell CLI the project area, the deliverable format, and the quality level the design needs.