Office hoursMonday to Friday, 7am to 5pmCall CLI1-866-892-6337Urgent or emergency locate?Call now ↗
CLI technician using utility locating equipment beside a roadway

Utility locating

Locate and mark the lines before you dig.

CLI combines a trained field workforce, supervised release, and ongoing audits to provide a locate record you can assess.

300+trained, certified field technicians
80%competency threshold on exams
6 weekssupervised field release
Ongoingsupervisory audits in the field

Utility scope

The lines your excavation cannot afford to hit.

CLI locates and marks the common utility classes found across public, commercial, and network work sites.

01

Water

Potable and facility water lines, located and marked before ground disturbance.

02

Electric

Electric power lines, cables, and conduit inside the locate scope.

03

Sewer

Sanitary and sewer lines, marked so the crew can plan the excavation around them.

04

Gas

Gas lines and other flammable-material routes, marked before the dig.

05

Cable

Traditional underground cable in the requested locate area.

06

Fibre optic

Fibre optic routes, identified before the excavation starts.

Read the marks

What the paint colours mean.

Locate marks follow the uniform damage-prevention colour code used across North America. Open each band to see which network the colour protects.

Marking colours follow the standard damage-prevention colour code. The locate ticket and field record define the scope that applies to your dig.

Field process

From request to a controlled record.

The exact contract workflow varies, but the field objective remains consistent: define the area, locate, mark, document, and report.

Define the scope

Provide the site address, planned dig dates, and locate ticket number.

Locate in the field

A trained technician works the assigned area using the applicable locating method.

Mark and document

The identified lines are marked and the field record is tied to the work.

Review and report

Supervisory audits and reporting support the contract record.

Utility locating instruments organized for technician training

Quality control

Technicians are trained and certified before release to your site.

CLI uses facility-owner-administered exams, an 80% competency threshold, six weeks of supervised field release, and ongoing audits on locate performance, safety, and drawing accuracy.

  • Facility-owner-administered exams
  • 80% competency threshold
  • Six-week supervised field release
  • Ongoing supervisory audits

Coverage

Plan around the operating season.

CLI locates in three regions. All three are in season now. Call to confirm the schedule for your planned dig dates.

In season

Ontario

Markham office: 33-461 Alden Rd

Call or submit the request form with your site address and dig dates.

View region
In season

Alberta

Calgary office: 6205 10th St SE

Call to confirm the routing for the planned work.

View region
In season

British Columbia

Routed through the toll-free line

Call with the project address to confirm the current routing.

View region
CLI field technician leaning on a service truck at sunset beside marked utilities

Before you dig

Put the locate request in motion.

Have the site address, dig dates, and locate ticket number ready. For contract scopes, use the procurement route.